//-->
Advanced topics in just-in-time management
Schniederjans, Marc J., (1999)
U-shaped assembly line layouts and their impact on labor productivity: An experimental study
Aase, Gerald R., (2004)
ARTICLES - A Heuristic Scheduling System for Ceramic Industrial Coatings - A heuristic-based scheduling system has reduced manufacturing processing time by 39 percent, late batches by 23 percent, scrapped batches by 49 percent, and scrap cost by 72 percent.
Olson, John R., (2000)