An adaptive genetic algorithm for demand-driven and resource-constrained project scheduling in aircraft assembly
Year of publication: |
March 2017
|
---|---|
Authors: | Shan, Siqing ; Hu, Zhongjun ; Liu, Zhilian ; Shi, Jihong ; Wang, Li ; Bi, Zhuming |
Published in: |
Information technology and management. - New York, NY [u.a.] : Springer, ISSN 1385-951X, ZDB-ID 2212813-X. - Vol. 18.2017, 1, p. 41-53
|
Subject: | Demand-driven | NP-hard problems | Genetic algorithm | Resource-constrained | Project scheduling | Resource-constrained project scheduling problem (RCPSP) | Aircraft assembly | Scheduling-Verfahren | Scheduling problem | Projektmanagement | Project management | Evolutionärer Algorithmus | Evolutionary algorithm | Theorie | Theory | Engpass | Bottleneck | Fließfertigung | Assembly-line production |
-
Kellenbrink, Carolin, (2016)
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2017)
-
A critical chain project scheduling method based on a differential evolution algorithm
Wuliang, Peng, (2014)
- More ...
-
Feature weighted naïve Bayes algorithm for information retrieval of enterprise systems
Wang, Li, (2014)
-
Developing a rapid response production system for aircraft manufacturing
Shan, Siqing, (2013)
-
Shan, Siqing, (2012)
- More ...