//-->
Key success factor analysis for e-SCM project implementation and a case study in semiconductor manufacturers
Hwang, Bang-Ning, (2013)
Key success factor abnalysis for e-SCM project implementation and a case study in semiconductor manufacturers
Hwang, Bang-ning, (2013)
An elective surgery scheduling problem considering patient priority
Min, Daiki, (2010)