An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system
Year of publication: |
2005
|
---|---|
Authors: | Das, Sidhartha R. ; Canel, Cem |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 10925260. - Vol. 97.2005, 3, p. 247-262
|
Saved in:
Saved in favorites
Similar items by person
-
An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system
Das, Sidhartha R., (2005)
-
The uncapacitated multi-period facilities location problem with profit maximization
Canel, Cem, (1999)
-
The uncapacitated multiāperiod facilities location problem with profit maximization
Canel, Cem, (1999)
- More ...