An algorithm for single-item capacitated economic lot sizing with piecewise linear production costs and general holding costs
Year of publication: |
1995
|
---|---|
Authors: | Shaw, Dong X. ; Wagelmans, Albert P. M. |
Publisher: |
Amsterdam [u.a.] |
Subject: | Produktionssteuerung | Production control | Mathematische Optimierung | Mathematical programming | Theorie | Theory |
-
Integrated simulation-optimisation of pull control systems
Pedrielli, Giulia, (2015)
-
Analysis of timeout mechaism in a testing-repair model
Kim, Jaehee, (2015)
-
Robust condition-based production and maintenance planning for degradation management
Sun, Qiuzhuang, (2023)
- More ...
-
Shaw, Dong X., (1998)
-
On the Complexity of a Class of Projective Interior Point Methods
Goldfarb, Donald, (1995)
-
Shaw, Dong X., (1998)
- More ...