An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem
| Year of publication: |
2014
|
|---|---|
| Authors: | Chen, Jiang Hang ; Lee, Der-Horng ; Goh, Mark |
| Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 232.2014, 1 (1.1.), p. 198-208
|
| Subject: | (S) Scheduling | Port container terminal | Unidirectional quay crane scheduling problem | Mathematical formulation | Scheduling-Verfahren | Scheduling problem | Containerterminal | Container terminal | Kran | Crane | Hafen | Port | Mathematische Optimierung | Mathematical programming | Containerverkehr | Container transport |
-
Dayama, Niraj Ramesh, (2017)
-
The study of the unidirectional quay crane scheduling problem : complexity and risk-aversion
Chen, Jiang Hang, (2017)
-
Hoseini, Seyed Farzad, (2018)
- More ...
-
A combinatorial benders' cuts algorithm for the quayside operation problem at container terminals
Chen, Jiang Hang, (2012)
-
The integrated yard truck and yard crane scheduling problem : Benders’ decomposition-based methods
Cao, Jin Xin, (2010)
-
A heuristic algorithm for yard truck scheduling and storage allocation problems
Lee, Der-Horng, (2009)
- More ...