//-->
Minimizing Makespan in Flowshops with Pallet Requirement: Computational Complexity
Wang, M., (1997)
Scheduling shops to minimize the weighted number of late jobs
Jozefowska, J., (1994)
Completion time variance minimization on a single machine is difficult
Kubiak, W., (1993)