//-->
Reducing tardy batches by seru production : model, exact solution, cooperative coevolution solution, and insights
Li, Xiaolong, (2023)
A parallel-machine scheduling problem with an antithetical property to maximize total weighted early work
Min, Yunhong, (2023)
Single-machine scheduling simultaneous consideration of resource allocations and exponential time-dependent learning effects
Zhang, Yurong, (2025)
Heuristics for the single machine scheduling problem with early and quadratic tardy penalties
Valente, Jorge M. S., (2007)
BEAM SEARCH HEURISTICS FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH LINEAR EARLINESS AND QUADRATIC TARDINESS COSTS
VALENTE, JORGE M. S., (2009)