//-->
A simulated annealing heuristic for scheduling to minimize mean weighted tardiness in a flowshop with sequence-dependent setup times of jobs -- A case study
Parthasarathy, S., (1997)
Research directions for enterprise resource planning (ERP) projects
Parthasarathy, S., (2012)
Equipment leasing
Parthasarathy, S., (1980)