An improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling
Year of publication: |
June 2017
|
---|---|
Authors: | Dao, Son Duy ; Abhary, Kazem ; Marian, Romeo |
Published in: |
Journal of industrial engineering international. - Heidelberg : SpringerOpen, ISSN 2251-712X, ZDB-ID 2664907-X. - Vol. 13.2017, 2, p. 143-159
|
Subject: | Genetic algorithm | Optimization | Precedence constraint | Integration of planning and scheduling | Variable-length chromosome | Evolutionärer Algorithmus | Evolutionary algorithm | Produktionsplanung | Production planning | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Mathematische Optimierung | Mathematical programming |
Type of publication: | Article |
---|---|
Type of publication (narrower categories): | Aufsatz in Zeitschrift ; Article in journal |
Language: | English |
Other identifiers: | 10.1007/s40092-016-0181-7 [DOI] hdl:10419/172560 [Handle] |
Source: | ECONIS - Online Catalogue of the ZBW |
-
Pitiot, Paul, (2013)
-
Novel bi-level hierarchical production planning in hybrid MTS/MTO production contexts
Rafiei, Hamed, (2013)
-
Heuristics for integrated job assignment and scheduling in the multi-plant remanufacturing system
Lin, Danping, (2015)
- More ...
-
An innovative model for resource scheduling in VCIM systems
Duy Dao, Son, (2018)
-
Duy Dao, Son, (2020)
-
Dao, Son Duy, (2017)
- More ...