//-->
Two-agent scheduling to minimize the total cost
Nong, Q.Q., (2011)
The bounded single-machine parallel-batching scheduling problem with family jobs and release dates to minimize makespan
Nong, Q.Q., (2008)
An improved on-line algorithm for scheduling on two unrestrictive parallel batch processing machines