//-->
Determination of economic order quantities (EOQ) in an integrated material flow system
Choi, Soodong, (2000)
The changing basis of performance measurement
Ghalayini, Alaa M., (1996)
Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness
Sun, Xiaoqing, (1999)