//-->
Scheduling a single machine with multiple job processing ability to minimize makespan
Wang, X., (2011)
An iterated local search heuristic for the capacitated prize-collecting travelling salesman problem
Tang, L., (2008)
The estimation and determinants of emerging market country risk and the dynamic conditional correlation GARCH model
Marshall, A.P., (2009)