An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times
Year of publication: |
2012
|
---|---|
Authors: | Wu, Tao ; Shi, Leyuan ; Song, Jie |
Published in: |
Annals of operations research. - Dordrecht, The Netherlands : Springer Nature B.V., ISSN 0254-5330, ZDB-ID 252629-3. - Vol. 196.2012, p. 635-650
|
Subject: | Losgröße | Lot size | Heuristik | Heuristics | Produktionsplanung | Production planning | Theorie | Theory | Mathematische Optimierung | Mathematical programming | Durchlaufzeit | Lead time |
-
Carvalho, Desiree M., (2022)
-
A two-stage flexible flow shop problem with unit-execution-time jobs and batching
Gerstl, Enrique, (2014)
-
Beraldi, Patrizia, (2008)
- More ...
-
Data mining-based dispatching system for solving the local pickup and delivery problem
Chen, Weiwei, (2013)
-
An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times
Wu, Tao, (2012)
-
Mathematical models for capacitated multi-level production planning problems with linked lot sizes
Wu, Tao, (2011)
- More ...