Analysis and algorithms for coordinated scheduling of parallel machine manufacturing and 3PL transportation
Nowadays, it is popular to outsource transportation and distribution of finished products to third-party logistics (3PL) providers in many industries. In order to shorten the response time from order receipt to delivery, and also to improve on-time delivery accuracy, the decision of manufacturing scheduling and transportation scheduling should consider the constraints between manufacturing and transportation. In this paper, we study a coordinated scheduling problem of parallel machine assembly manufacturing and multi-destination transportation in the make-to-order (MTO) consumer electronics supply chain (CESC). By considering the constraints between parallel machine assembly and 3PL transportation, the overall problem is decomposed into a parallel machine scheduling sub-problem and a 3PL transportation sub-problem. The 3PL transportation problem is proved to be NP-complete. Heuristic algorithms are proposed to solve the parallel machine assembly scheduling problem.
| Year of publication: |
2008
|
|---|---|
| Authors: | Li, Kunpeng ; Sivakumar, Appa Iyer ; Ganesan, Viswanath Kumar |
| Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 115.2008, 2, p. 482-491
|
| Publisher: |
Elsevier |
| Keywords: | 3PL Transportation Assembly Supply chain Coordinated scheduling |
Saved in:
Saved in favorites
Similar items by person
-
Li, Kunpeng, (2004)
-
Li, Kunpeng, (2008)
-
Li, Kunpeng, (2008)
- More ...