Type of publication: Article
Language: English
Notes:
Chikán, Attila and Vastag, Gyula orcid:0000-0002-6823-3367 (1987) Analysis of a Multi-Echelon Production-Inventory System with Random Supply. Engineering Costs and Production Economics , 12 (1-4). pp. 275-281. DOI 10.1016/0167-188X(87)90088-7 <http://dx.doi.org/10.1016/0167-188X(87)90088-7>
Source:
BASE
Persistent link: https://www.econbiz.de/10011316305