//-->
Analysis of deteriorating inventory-production systems using a linear quadratic regulator
Andijani, A., (1998)
Trade‐off between maximizing throughput rate and minimizing system time in kanban systems
Andijani, A., (1997)
Trade-off between maximizing throughput rate and minimizing system time in kanban systems