//-->
Complexity of the two-stage no-wait assembly problem with setup and removal times separated
Strusevich, Vitaly A., (1991)
Minimizing Makespan in Flowshops with Pallet Requirements : Computational Complexity
Wang, M. W., (2010)
A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines
Chen, Chun-lung, (2009)
Kapazitätsorientierte Losgrößenplanung in PPS-Systemen
Helber, Stefan, (1994)
Cash-flow oriented lot sizing in MRP II systems
Helber, Stefan, (1998)
Performance analysis of flow lines with non-linear flow of material
Helber, Stefan, (1999)