//-->
Minimizing makespan in hybrid flowshops
Lee, C.-Y., (1994)
Robust multi-item newsboy models with a budget constraint
Vairaktarakis, G.L., (2000)
The single-machine scheduling problem to minimize total tardiness subject to minimum number of tardy jobs
Vairaktarakis, G.L., (1995)