//-->
An integrated problem of production scheduling and transportation in a two-stage supply chain with carbon emission consideration
Jos, Bobin Cherian, (2021)
Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times
Rajendran, Chandrasekharan, (2003)
A performance analysis of dispatching rules and a heuristic in static flowshops with missing operations of jobs
Rajendran, Chandrasekharan, (2001)