Application of hybrid MCDM techniques for prioritising the gaps in an agile manufacturing implementation project
Year of publication: |
2014
|
---|---|
Authors: | Ray, S. Aravind ; Vinodh, S. ; Gaurav, W. S. ; Sundaram, S. Shiva |
Published in: |
International journal of services and operations management. - Olney : Inderscience, ISSN 1744-2370, ZDB-ID 2186492-5. - Vol. 17.2014, 4, p. 421-438
|
Subject: | agile manufacturing | Agility assessment | agility gaps | multiple criteria decision making | MCDM | analytic network process | ANP | technique for order performance by similarity to ideal solution | TOPSIS | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | AHP-Verfahren | AHP approach | Flexibles Fertigungssystem | Flexible manufacturing system | Industrie | Manufacturing industries | Projektmanagement | Project management |
-
A novel hybrid model based on DEMATEL, ANP and TOPSIS for supplier selection in agile supply chains
Alimardani, Maryam, (2014)
-
Agility strategies in manufacturing companies using a hybrid MCDM based on ANP and TOPSIS
Tadayoni, Mahsa, (2022)
-
Atiq-Ur-Rehman, Muhammad, (2017)
- More ...
-
Ray, S. Aravind, (2013)
-
Axiomatic modelling of agile production system design
Vinodh, S., (2011)
-
Sustainable manufacturing : concepts, tools, methods, and case studies
Vinodh S, (2020)
- More ...