Approximation algorithms for scheduling a single machine to ninimize total late work
Year of publication: |
1991
|
---|---|
Authors: | Potts, Chris N. ; Van Wassenhove, Luk N. |
Publisher: |
Fontainebleau, France : INSEAD |
Subject: | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Algorithmus | Algorithm | Produktionssteuerung | Production control |
-
A better heuristic for preemptive parallel machine scheduling with batch set-up times
Chen, Bo, (1992)
-
Scheduling jobs on parallel machines, each with a unit-capacity buffer
Baas, S. M., (1990)
-
Improved algorithms for machine allocation in manufacturing problems
Frenk, Johannes G., (1991)
- More ...
-
Single machine scheduling to minimize total weighted late work
Hariri, A. M., (1992)
-
Integrating scheduling with batching and lot-sizing : a review of algorithms and complexity
Van Wassenhove, Luk N., (1991)
-
Single machine scheduling to minimize total late work
Van Wassenhove, Luk N., (1991)
- More ...