//-->
A forward branch-and-search algorithm and forecast horizon results for the changeover scheduling problem
Blocher, James D., (1996)
Blockchain applications in supply chain
Sengupta, Kaushik, (2021)
Optimal single machine scheduling of products with components and changeover cost
Zhou, Feng, (2014)