Assembly line productivity improvement as re-engineered by MOST
Year of publication: |
2016
|
---|---|
Authors: | Karim, A. N. Mustafizul ; Saravanan Tanjong Tuan ; Kays, H. M. Emrul |
Published in: |
The international journal of productivity and performance management : IJPPM. - Bingley : Emerald, ISSN 1741-0401, ZDB-ID 2135449-2. - Vol. 65.2016, 7, p. 977-994
|
Subject: | Line balancing | Bottlenecks | Maynard Operation Sequence Technique (MOST) | Predetermined time standard (PTS) | Productivity improvement | Work measurement | Produktivität | Productivity | Fließfertigung | Assembly-line production | Engpass | Bottleneck | Theorie | Theory | Scheduling-Verfahren | Scheduling problem |
-
Assembly line productivity improvement as re-engineered by MOST
Karim, A.N. Mustafizul, (2016)
-
Tannady, Hendy, (2018)
-
Bottleneck identification through simulation modelling : a case of solid tire manufacturing sector
Edirisinghe, E. A. D. D. D., (2023)
- More ...
-
Amjad Khalili, (2018)
-
Quality management system and sustainability : a Malaysian perspective
Amjad Khalili, (2018)
-
Amjad Khalili, (2017)
- More ...