//-->
Integrated simulation-optimisation of pull control systems
Pedrielli, Giulia, (2015)
Analysis of timeout mechaism in a testing-repair model
Kim, Jaehee, (2015)
Robust condition-based production and maintenance planning for degradation management
Sun, Qiuzhuang, (2023)
"Just-in-time" production of large-scale assemblies : an integrative perspective
Kolisch, Rainer, (1997)
Integrated scheduling, assembly area- and part-assignment for large scale, make-to-order assemblies
Kolisch, Rainer, (1998)