Balancing and sequencing of stochastic mixed-model assembly U-lines to minimise the expectation of work overload time
Year of publication: |
2014
|
---|---|
Authors: | Dong, Jietao ; Zhang, Linxuan ; Xiao, Tianyuan ; Mao, Huachao |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 52.2014, 24 (15.12.), p. 7529-7548
|
Subject: | mixed-model U-line | balancing and sequencing | stochastic | simulated annealing | work overload time | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Produktionssteuerung | Production control | Theorie | Theory |
-
Mosadegh, Hadi, (2020)
-
Peng, Yunfang, (2023)
-
Shoaardebili, Niloofar, (2015)
- More ...
-
A performance-based Bayesian method for the optimisation of manufacturing resources collaboration
Zhou, Jian, (2009)
-
A hierarchical federated integration architecture for collaborative product development
Sun, Hongbo, (2012)
-
A performance-based Bayesian method for the optimisation of manufacturing resources collaboration
Zhou, Jian, (2009)
- More ...