BATCHING MACHINE SCHEDULING WITH BICRITERIA: MAXIMUM COST AND MAKESPAN
In this paper, the problem of minimizing maximum cost and makespan simultaneously on an unbounded parallel-batching machine is considered. An unbounded parallel-batching machine is a machine that can handle any number of jobs in a batch and the processing time of a batch is the largest processing time of jobs in the batch. The main goal of a multicriteria problem is to find Pareto optimal solutions. We present a polynomial-time algorithm to produce all Pareto optimal solutions of this bicriteria scheduling problem.
Year of publication: |
2014
|
---|---|
Authors: | HE, CHENG ; LIN, HAO ; YUAN, JINJIANG ; MU, YUNDONG |
Published in: |
Asia-Pacific Journal of Operational Research (APJOR). - World Scientific Publishing Co. Pte. Ltd., ISSN 1793-7019. - Vol. 31.2014, 04, p. 1450025-1
|
Publisher: |
World Scientific Publishing Co. Pte. Ltd. |
Subject: | Multicriteria scheduling | batching machine | maximum cost | Pareto optimal solutions | computational complexity |
Saved in:
Saved in favorites
Similar items by subject
-
An improved algorithm for a bicriteria batching scheduling problem
He, Cheng, (2013)
-
Hierarchical optimization on an unbounded parallel-batching machine
He, Cheng, (2018)
-
Ablaufplanung bei Reihenfertigung mit mehrfacher Zielsetzung auf der Basis von Ameisenalgorithmen
Petri, Christian, (2006)
- More ...
Similar items by person