Behavioural analysis of a hydroelectric production power plant under reworking scheme
Year of publication: |
2015
|
---|---|
Authors: | Manglik, Monika ; Ram, Mangey |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 53.2015, 2 (15.1.), p. 648-664
|
Subject: | electronic power | hydroelectric production power plant | Markov model | reliability indices | sensitivity | Theorie | Theory | Kraftwerk | Power plant | Markov-Kette | Markov chain | Wasserkraft | Hydropower | Produktivität | Productivity | Elektrizitätswirtschaft | Electric power industry | Wasserkraftwerk | Hydropower plant |
-
Pumped hydropower storage optimization and trading considering short-term electricity markets
Braun, Sebastian Matthias, (2020)
-
Economic feasibility of semi-underground pumped storage hydro power plants in open pit mines
Wessel, Michael, (2020)
-
The problems and prospects of energy development in Buryatia
Borisov, G. O., (2020)
- More ...
-
Reliability Measures Analysis of an Industrial System under Standby Modes and Catastrophic Failure
Ram, Mangey, (2016)
-
Reliability and Availability analysis of a cloud computing transition system under multiple failures
Manglik, Monika, (2020)
-
Air quality management using genetic algorithm based heuristic fuzzy time series model
Bhagat, Lalit, (2021)
- More ...