Bi-objective cyclic scheduling in a robotic cell with processing time windows and non-Euclidean travel times
Year of publication: |
2014
|
---|---|
Authors: | Feng, Jianguang ; Che, Ada ; Wang, Nengmin |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 52.2014, 9 (1.5.), p. 2505-2518
|
Subject: | bi-objective cyclic scheduling | robotic cell | mixed integer programming | E-constraint method | Scheduling-Verfahren | Scheduling problem | Roboter | Robot | Fertigungsinsel | Cellular manufacturing | Ganzzahlige Optimierung | Integer programming | Transportzeit | Travel time | Durchlaufzeit | Lead time | Branch-and-Bound | Branch and Bound |
-
Two-machine robotic cell scheduling problem with sequence-dependent setup times
Zarandi, M. H. Fazel, (2013)
-
Cyclic flow shop robotic cell scheduling problem with multiple part types
Elmi, Atabak, (2022)
-
Yan, Pengyu, (2010)
- More ...
-
Energy-efficient unrelated parallel machine scheduling with general position-based deterioration
Wang, Yusheng, (2023)
-
Robust optimization for the cyclic hoist scheduling problem
Che, Ada, (2015)
-
Feng, Jianguang, (2018)
- More ...