Bi-objective no-wait multiproduct multistage product scheduling problem with flexible due dates based on MOIDE- MA
Year of publication: |
2022
|
---|---|
Authors: | Yan, Xueli ; Gu, Xingsheng |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 137.2022, p. 1-17
|
Subject: | Differential evolution algorithm | Flexible due dates | Makespan | Memetic algorithm | Multi-objective evolutionary algorithm | No-wait multiproduct multistage scheduling problem | Scheduling-Verfahren | Scheduling problem | Algorithmus | Algorithm | Evolutionärer Algorithmus | Evolutionary algorithm | Theorie | Theory | Durchlaufzeit | Lead time | Mehrproduktfertigung | Multiproduct production | Mehrstufige Produktion | Multistage production | Flexibles Fertigungssystem | Flexible manufacturing system |
-
Flexible open shop scheduling problem to minimize makespan
Bai, Danyu, (2016)
-
Jolai, F., (2012)
-
Jafarzadeh, Hassan, (2017)
- More ...
-
Chang, Hong, (2013)
-
Deng, Guanlong, (2013)
-
Gu, Jinwei, (2010)
- More ...