Bicriteria Scheduling on an Unbounded Parallel-Batch Machine for Minimizing Makespan and Maximum Cost
| Year of publication: |
[2022]
|
|---|---|
| Authors: | Li, Shuguang ; Geng, Zhichao |
| Publisher: |
[S.l.] : SSRN |
| Subject: | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Theorie | Theory | Heuristik | Heuristics |
-
Two-machine chain-reentrant flow shop with the no-wait constraint
Amrouche, Karim, (2020)
-
Henke, Thomas, (2022)
-
Schaller, Jeffrey, (2022)
- More ...
-
Li, Shuguang, (2017)
-
Li, Shuguang, (2017)
-
Pareto-scheduling of two competing agents with their own equal processing times
Chen, Rubing, (2022)
- More ...