//-->
Scheduling projects with variable-intensity activities: The case of dynamic earliness and tardiness costs
Kogan, Konstantin, (1999)
Optimal flow control of flexible manufacturing systems: Setup localization by an iterative procedure
Kogan, Konstantin, (1997)