//-->
Heuristic interpretation of infeasible solutions to a production scheduling problem in cigarette manufacture
Nicholls, M.G., (1996)
Scheduling production in a heavily constrained plant -- Anode manufacture in an aluminium smelter
Nicholls, M.G., (1995)
Optimizing the operations of an ingot mill in an aluminium smelter
Nicholls, M.G., (1994)