//-->
Case study on statistically estimating minimum makespan for flow line scheduling problems
Wilson, Amy D., (2004)
Satisfying due-dates in large multi-factory supply chains
Thoney, Kristin A., (2002)
Allocating job-shop manpower to minimize : Optimality criteria, search heuristics, and probabilistic quality metrics
Lobo, Benjamin J., (2013)