Cyclic multiple-robot scheduling with time-window constraints using a critical path approach
| Year of publication: |
2007
|
|---|---|
| Authors: | Alcaide, David ; Chu, Chengbin ; Kats, Vladimir ; Levner, Eugene ; Sierksma, Gerard |
| Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 177.2007, 1, p. 147-162
|
| Publisher: |
Elsevier |
Saved in:
Saved in favorites
Similar items by person
-
Cyclic multiple-robot scheduling with time-window constraints using a critical path approach
Alcaide, David, (2007)
-
Feng, Jianguang, (2024)
-
An improved algorithm for cyclic flowshop scheduling in a robotic cell
Levner, Eugene, (1997)
- More ...