Desert sparrow optimization algorithm for the bicriteria flow shop scheduling problem with sequence-independent setup time
Year of publication: |
2022
|
---|---|
Authors: | Sharma, Meenakshi ; Sharma, Manisha ; Sharma, Sameer |
Published in: |
Operational research : an international journal. - Berlin : Springer, ISSN 1866-1505, ZDB-ID 2425760-6. - Vol. 22.2022, 4, p. 4353-4396
|
Subject: | Bicriteria | Delay time | Desert sparrow optimization | Heuristic | Primary: 90 | Scheduling | Secondary: 90B30 | Sequence-independent setup time | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Theorie | Theory | Algorithmus | Algorithm | Mathematische Optimierung | Mathematical programming |
-
A two-stage flow shop batch-scheduling problem with the option of using Not-All-Machines
Gerstl, Enrique, (2013)
-
Ozturk, Onur, (2017)
-
Krishnaraj, J., (2012)
- More ...
-
Integrated stochastic bicriteria flow shop scheduling problem with preventive maintenance
Sharma, Meenakshi, (2022)
-
Sharma, Manisha, (2014)
-
Sharma, Manisha, (2022)
- More ...