//-->
Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor backend facility
Weigert, Gerald, (2009)
Optimization of manufacturing processes by distributed simulation
Weigert, G., (2006)
Modelling and optimisation of assembly processes
Weigert, G., (2011)