//-->
Metaheuristics for the Stochastic Hoist Scheduling Problem (SHSP)
Fleury, G., (2001)
A new heuristic based on a hypergraph representation for the tool switching problem
Djellab, H., (2000)
A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles
Deroussi, L., (2008)