Development and application of a cost-benefit framework for energy reliability: Using probabilistic methods in network planning and regulation to enhance social welfare: The N-1 rule
Although electricity is crucial to many activities in developed societies, guaranteeing a maximum reliability of supply to end-users is extremely costly. This situation gives rise to a trade-off between the costs and benefits of reliability. The Dutch government has responded to this trade-off by changing the rule stipulating that electricity networks must be able to maintain supply even if one component fails (known as the N-1 rule), even in maintenance situations. This rule was changed by adding the phrase "unless the costs exceed the benefits." We have developed a cost-benefit framework for the implementation and application of this new rule. The framework requires input on failure probability, the cost of supply interruptions to end-users and the cost of investments. A case study of the Dutch grid shows that the method is indeed practicable and that it is highly unlikely that N-1 during maintenance will enhance welfare in the Netherlands. Therefore, including the limitation "unless the costs exceed the benefits" in the rule has been a sensible policy for the Netherlands, and would also be a sensible policy for other countries.
Year of publication: |
2010
|
---|---|
Authors: | de Nooij, Michiel ; Baarsma, Barbara ; Bloemhof, Gabriƫl ; Slootweg, Han ; Dijk, Harold |
Published in: |
Energy Economics. - Elsevier, ISSN 0140-9883. - Vol. 32.2010, 6, p. 1277-1282
|
Publisher: |
Elsevier |
Keywords: | Valuing supply interruption Cost-benefit analysis Reliability of electricity supply |