Drum-buffer-rope and workload control in high-variety flow and job shops with bottlenecks : an assessment by simulation
Year of publication: |
June 2017
|
---|---|
Authors: | Thürer, Matthias ; Stevenson, Mark A. ; Silva, Cristovao ; Qu, Ting |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 188.2017, p. 116-127
|
Subject: | Drum-buffer-rope | Workload control | Order release | Bottleneck | Theory of constraints | Engpass | Simulation | Produktionssteuerung | Production control | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Produktionsplanung | Production planning |
-
Workload control in unbalanced job shops
Fernandes, Nuno O., (2014)
-
Thürer, Matthias, (2022)
-
Concerning workload control and order release : the pre-shop pool sequencing decision
Thürer, Matthias, (2015)
- More ...
-
The design of simple subcontracting rules for make-to-order shops : an assessment by simulation
Thürer, Matthias, (2014)
-
Continuous workload control order release revisited : an assessment by simulation
Thürer, Matthias, (2014)
-
Job sequencing and selection within workload control order release : an assessment by simulation
Thürer, Matthias, (2016)
- More ...