Dynamic priority rule-based forward-backward heuristic algorithm for resource levelling problem in construction project
Year of publication: |
2013
|
---|---|
Authors: | He, Lihua ; Zhang, Lianying |
Published in: |
Journal of the Operational Research Society : OR. - Basingstoke, Hampshire : Palgrave, ISSN 0030-3623, ZDB-ID 716033-1. - Vol. 64.2013, 8, p. 1106-1117
|
Subject: | resource levelling | forward-backward scheduling | dynamic priority rule | heuristics | optimization | construction project | Heuristik | Heuristics | Projektmanagement | Project management | Scheduling-Verfahren | Scheduling problem | Bauwirtschaft | Construction industry | Bauprojekt | Construction project | Algorithmus | Algorithm |
-
Wood-based construction project supplier selection under uncertain starting date
Mobtaker, Azadeh, (2018)
-
Hsiau, Hsian Jong, (2009)
-
Causes of delay in construction projects in Oman
Umar, Tariq, (2018)
- More ...
-
He, Lihua, (2013)
-
He, Lihua, (2013)
-
Liu, Fengcai, (2025)
- More ...