//-->
SINGLE MACHINE SCHEDULING TO MANIMIZE TOTAL WEIGHTED LATE WORK.
HARIRI, A.M.A., (1990)
INTEGRATING SCHEDULING WITH BATCHING AND LOT-SIZING.
POTTS, C.N., (1990)
The Bounded Knapsack Problem with Setups
Sural, H., (1997)