//-->
Single operation earliness-tardiness scheduling with machine activation costs
Panwalkar, Shrikant S., (2002)
Determination of common due window location in a single machine scheduling problem
Liman, Surya D., (1996)
Lot-sizing and scheduling problem with earliness tardiness and setup penalties
Supithak, Wisut, (2010)