Economic design of multivariate Bayesian control chart with two sampling intervals
Year of publication: |
2016
|
---|---|
Authors: | Naderkhani, Farnoosh ; Makis, Viliam |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 174.2016, p. 29-42
|
Subject: | Bayesian control chart | Two sampling intervals | Semi-Markov decision process | Posterior probability | Economic design | Quality control | Theorie | Theory | Statistische Qualitätskontrolle | Statistical quality control | Bayes-Statistik | Bayesian inference | Stichprobenerhebung | Sampling | Qualitätsmanagement | Quality management | Markov-Kette | Markov chain | Wahrscheinlichkeitsrechnung | Probability theory | Produktionssteuerung | Production control | Statistische Methodenlehre | Statistical theory |
-
Time to signal distribution of multivariate Bayesian control chart with dual sampling scheme
Naderkhani, Farnoosh, (2022)
-
Huang, Ching Chun, (2014)
-
Bahiraee, Ehsan, (2014)
- More ...
-
Highway Accident Modeling and Forecasting in Winter
Khaleghei Ghosheh Balagh, Akram, (2014)
-
Jafari, Leila, (2018)
-
Time to signal distribution of multivariate Bayesian control chart with dual sampling scheme
Naderkhani, Farnoosh, (2022)
- More ...