Economic lot scheduling with deliberated and controlled coproduction
Year of publication: |
2012
|
---|---|
Authors: | Vidal-Carreras, Pilar I. ; Garcia-Sabater, Jose P. ; Coronado-Hernandez, Jairo R. |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 219.2012, 2, p. 396-404
|
Publisher: |
Elsevier |
Subject: | Production | Lot sizing | Scheduling | Controlled coproduction | Deliberated coproduction |
-
Kuhn, Heinrich, (2014)
-
Lead time considerations for the multi-level capacitated lot-sizing problem
Almeder, Christian, (2015)
-
The economic lot scheduling problem : a survey
Santander-Mercado, Alcides, (2016)
- More ...
-
Economic lot scheduling with deliberated and controlled coproduction
Vidal-Carreras, Pilar I., (2012)
-
Economic lot scheduling with deliberated and controlled coproduction
Vidal-Carreras, Pilar I., (2012)
-
Comparison of heuristics for an economic lot scheduling problem with deliberated coproduction
Vidal-Carreras, Pilar I., (2009)
- More ...