Energy consumption control in the two-machine Bernoulli serial production line with setup and idleness
Year of publication: |
2023
|
---|---|
Authors: | Pei, Zhi ; Yang, Peiqi ; Wang, Yujuan ; Yan, Chao-Bo |
Subject: | Bernoulli machine | energy consumption | heuristics | nonlinear polynomial optimisation | Serial production line | Energiekonsum | Energy consumption | Heuristik | Heuristics | Serienfertigung | Serial production | Theorie | Theory | Produktionssteuerung | Production control | Mathematische Optimierung | Mathematical programming | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Durchlaufzeit | Lead time |
-
Zhang, Sicheng, (2018)
-
Minimizing energy consumption and makespan in a two-machine flowshop scheduling problem
Mansouri, S. Afshin, (2016)
-
Kim, Woo-sung, (2015)
- More ...
-
Multi-attribute decision making based on a novel IF point operator
Pei, Zhi, (2017)
-
Incentive-compatible information sharing by dual-channel retailers
Yan, Ruiliang, (2012)
-
How does the added new online channel impact the supporting advertising expenditure?
Pei, Zhi, (2014)
- More ...