Ergonomic risk and cycle time minimization for the U-shaped worker assignment assembly line balancing problem : a multi-objective approach
Year of publication: |
2020
|
---|---|
Authors: | Zhang, Zikai ; Tang, Qiuhua ; Ruiz, Rubén ; Zhang, Liping |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 118.2020, p. 1-15
|
Subject: | Ergonomic risks | Multi-objectives | U-shaped assembly line | Worker assignment | Fließfertigung | Assembly-line production | Theorie | Theory | Arbeitswissenschaft | Human engineering | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | Risiko | Risk |
-
Preventing ergonomic risks with integrated planning on assembly line balancing and parts feeding
Battini, Daria, (2017)
-
Balancing collaborative human-robot assembly lines to optimise cycle time and ergonomic risk
Stecke, Kathryn E., (2022)
-
Ergonomics in assembly line balancing based on energy expenditure : a multi-objective model
Battini, Daria, (2016)
- More ...
-
Modelling and optimisation of energy-efficient U-shaped robotic assembly line balancing problems
Zhang, Zikai, (2019)
-
Zhang, Zikai, (2021)
-
Li, Zixiang, (2017)
- More ...