Exact algorithms for production planning in mining considering the use of stockpiles and sequencing of power shovels in open-pit mines
Year of publication: |
2022
|
---|---|
Authors: | Flores-Fonseca, César ; Linfati, Rodrigo ; Escobar, John Willmer |
Published in: |
Operational research : an international journal. - Berlin : Springer, ISSN 1866-1505, ZDB-ID 2425760-6. - Vol. 22.2022, 3, p. 2529-2553
|
Subject: | Mixed integer linear programming | Mine planning | Net present value (NPV) | Power shovel sequencing | Production scheduling | Stockpile | Bergbau | Mining | Scheduling-Verfahren | Scheduling problem | Produktionsplanung | Production planning | Theorie | Theory | Algorithmus | Algorithm | Mathematische Optimierung | Mathematical programming |
-
Short-term planning optimization model for underground mines
Campeau, Louis-Pierre, (2020)
-
Short-term underground mine planning with uncertain activity durations using constraint programming
Aalian, Younes, (2022)
-
Long term production planning of open pit mines by ant colony optimization
Shishvan, Masoud Soleymani, (2015)
- More ...
-
Cataldo-Díaz, Cristian, (2024)
-
Núñez-Muñoz, Matías, (2023)
-
Bernal, Jose, (2017)
- More ...