//-->
A concise survey of scheduling with time-dependent processing times
Cheng, T.C.E., (2004)
Minimizing the weighted number of tardy jobs and maximum tardiness in relocation problem with due date constraints
Lin, B.M.T., (1999)
Parallel-machine batching and scheduling to minimize total completion time
Cheng, T.C.E., (1996)