Fabrication scheduling on a single machine with due date constraints
Year of publication: |
2002
|
---|---|
Authors: | Lin, Bertrand M. T. |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 136.2002, 1, p. 95-105
|
Publisher: |
Elsevier |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Server scheduling on parallel dedicated machines with fixed job sequences
Cheng, T.C.E., (2019)
-
Scheduling in the two-machine flowshop with due date constraints
Lin, Bertrand M. T., (2001)
-
Minimizing the total weighted completion time in the relocation problem
Kononov, Alexander V., (2010)
- More ...